Proyectos

62A7_1

Benidorm Potable Water Treatment Station (Alicante)

Previous Next Digital Twin of the Benidorm (Alicante) drinking water treatment plant to digitalise operation, maintenance and safety tasks. Capacity 52.200 m3 SPAIN Hired services: Digitalization of the plant (laser scanner + parametric 3D BIM model) Digitalization of O&M databases Integration of the 3D BIM model with the O&M databases Implementation of the DI Twin […]

62C6_4

Suez wastewater treatment plant in Pampa Inalámbrica (Peru)

Previous Next Pampa Inalámbrica Wastewater Treatment Plant in the city of Ilo in the Moquegua region (Peru) Water line: Pretreatment. F/Q treatment. primary settler. PH adjustment chamber. Biological Reactor. Secondary settler. Tertiary treatment sand filters and chlorination. Sludge line: Primary thickener. Secondary thickener. thickening building. Digester. digestion building. Light sludge thickener. Dewatering and silo building. […]

62E3_1

Riera Gavarra channeling in the municipality of Canet de Mar (Barcelona)

Previous Next Canalization of the Gavarra stream in the municipality of Canet de Mar (Barcelona) Design flow section 1: 34,56 m3/s Design flow section 2: 45,36 m3/s Return period 500 years Material: Prefabricated walls and breakwater (channel) Prefabricated box (ducting) (Height 2,0 m, width 5,0 m and length 790 m) SPAIN Hired services: Basic project […]

62C5_4

Suez wastewater treatment plant in Media Luna (Peru)

Previous Next Media Luna Wastewater Treatment Plant in the city of Ilo in the Moquegua region (Peru) Water line: Pretreatment. F/Q treatment. primary settler. PH adjustment chamber. Biological Reactor. Secondary settler. Tertiary treatment sand filters and chlorination. Sludge line: Primary thickener. Secondary thickener. thickening building. Digester. digestion building. Light sludge thickener. Dewatering and silo building. […]

62A5_4

Los Guillermos Potable Water Treatment Plant in Alcantarilla (Murcia)

Previous Next Digital Twin of the Los Guillermos potable water treatment station in Alcantarilla (Murcia) to digitize operation, maintenance and safety tasks Annual volume 2.3 hm3 Capacity 400 m3/h Filtration in granulated activated carbon, pre-oxidation and disinfection by application of ozone SPAIN Hired services: Digitalization of the plant (laser scanner + parametric 3D BIM model) […]

62C4_1

Aqualogy Bello WWTP urban sludge thermal drying installation in Medellín (Colombia)

Previous Next Design of the urban sludge thermal drying installation using the STC low temperature drying system at the Bello WWTP in Medellín (Colombia). Product: Anaerobically digested urban sludge Quantity of product: San Fernando WWTP: 90 t/day (32,850 t/year) Bello WWTP: 310 t/day (113,150 t/year) Average: 400 t/day (146,000 t/year) Initial dryness: San Fernando WWTP: […]

62E2_1

Channeling Riera de Castellolí in the municipality of Castellolí (Barcelona)

Previous Next Canalization of the Castellolí stream in the municipality of Castellolí (Barcelona) Basin area 1,500 Ha Return period 500 years Design flow 150 m3/s Material curved corrugated steel plates 6,5 m in diameter along 100 m length. High strength metal bolt joints SPAIN Hired services: Basic project in BIM Executive project in BIM Construction […]

62A4_4

BonÀrea Potable Water Treatment Plant in Épila (Zaragoza)

Previous Next Potable Water Treatment Station of the BonÀrea Agrifood Park in Épila (Zaragoza) Design flow 10,000 m3/day and an annual maximum of 3.4 Hm3/year Treatment line: Pre-chlorination of pumped water with dosing of chlorine dioxide solution. Coagulation of the waters. water flocculation. Clarification of the water from the sludge formed. Accumulation of clarified water […]

62C3_3

Suez Biofactory (thermal drying and sludge gasification) in PTAS Trebal Mapocho (Chile)

Previous Next Project for the implementation of low-temperature thermal drying lines for urban sludge and energy recovery through advanced synthesis gasification technologies at the Trebal Mapocho WWTP (Chile). Thermal sludge drying (hourly capacity): 23.99 tn/h/line (2 lines) Dry sludge gasification: 7.46 tn/h (total in 3 pyrolysers) Cogeneration by syngas in engines at 100% load and […]